PROJET : ....................................... Affaire : .............................................

PROJECT : ................................. Sub/Project : .........................................


STRUCTURE ET REGIME PERMANENT DU RESEAU

GENERAL SYSTEM DETAILS ( output )


BALLON

ANTI-WATERHAMMER VESSEL
(Surge Vessel)


BALLON

NOEUD

SECTION
( M2 )

VOLUME AIR INITIAL
( M3 )

NIVEAU D'EAU
( NGF )

RH-ENTREE
( S2/M5 )

RH-SORTIE ( S2/M5 )

VESSEL N°

NODE

VESSEL SECTION

INITIAL AIR VOLUME

WATER LEVEL

FRICTION LOSSES
RH-IN

FRICTION LOSSES
RH-OUT

1

1

0.55000

0.50000

1.0000

0.83000

0.55000


BALLON

NOEUD

VOLUME AIR FINAL
( M3 )

VOLUME AIR MINIMAL
( M3 )

DATE ( Sec )

VOLUME AIR MAXIMAL
( M3 )

DATE ( Sec )

VESSEL N°

NODE

AIR VOLUME
END SIMULATION

MINI AIR VOLUME

PERIOD

MAXI AIR VOLUME
DISPLACED

PERIOD

1

1

0.6545

0.3818

39

1.256